TransNet
Home
NCC Home
Introduction
Build NCC
Highway
Improvements
Coastal Rail (LOSSAN)
Environmental Enhancements
Public Works Plan
Completed Projects
Contact
................................
Introduction
Documents
EIR/EIS
Full Report
Appendices
Appendix A: Resources Evaluated Relative to the Requirements of Section 4(f) and De Minimis Determinations for the I-5 North Coast Corridor Project San Diego, California – October 2009, Revised September 2013
Appendix B: Title VI Relocation Policy Statement – March 2012
Appendix C: Relocation Assistance Information
Appendix D: Environmental Commitments Record (ECR)
Appendix E: Farmland Conversion Impact Rating Form
Appendix F: List of Acronyms
Appendix G: CEQA Environmental Checklist
Appendix H: Responses to Comments Volume I through Volume V Final Environmental Impact Report/Environmental Impact Statement – October 2013
Appendix I: Non-standard Features
Appendix J: Potential Utility Relocations
Appendix K: Reference Graphics from the Draft EIR/EIS and Supplemental Draft EIR/EIS
Appendix L: Design Guidelines: I-5 NCC Project
Appendix M: Clean Water Act – Section 404(b)(1) Alternatives Analysis Evaluation and LEDPA Identification
Appendix N: ACOE Jurisdictional Delineation Verification
Appendix O: Biological Opinion
Appendix P: Resource Enhancement and Mitigation Program
Appendix Q: ACOE General Air Quality Conformity
Appendix R: Public Works Plan/Transportation and Resource Enhancement Program for the I-5 North Coast Corridor Project San Diego, California – October 2013
North Coast Corridor Public Works Plan/Transportation and Resource Enhancement Program Appendix A-H – Updated Draft March 2013
Supporting Technical Studies
Land Use
I-5 North Coast Community Enhancement Plan – January 2008
Community Enhancement Plan Project Notebook – January 2008
Growth and Community Impacts
Barrio Carlsbad Community Cohesion Report – June 2008
I-5 North Coast Corridor Final Community Impact Assessment – October 2007
Draft Relocation Impact Report For the I-5 North Coast Corridor Project San Diego, California – October 2007
Final Relocation Impact Statement – September 2013
I-5 North Coast Managed Lanes Value Pricing Study From La Jolla Village Drive to Vandegrift Boulevard – Concept Plan Volume I – April 2006
I-5 North Coast Managed Lanes Value Pricing Study From La Jolla Village Drive to Vandegrift Boulevard – Concept Plan Volume II – April 2006
Farmland Agriculture
Agriculture Viability Analysis for the Manchester Property in Encinitas and the Cannon Road Property in Carlsbad, California for the North Coast Corridor Public Works Plan/Transportation and Resource Enhancement Program – September 2013
Traffic
Direct Access Ramps / Local Circulation System Impact Study Technical Report No. 1 Area of Influence Analysis – August 2004
Direct Access Ramps / Local Circulation System Impact Study Technical Report No. 2 Existing Conditions Data Collection – August 2004
Direct Access Ramps / Local Circulation System Impact Study Technical Report No. 3 Traffic Analysis Methodologies and Standards – July 2004
Direct Access Ramps / Local Circulation System Operations Report Technical Report No. 7 – August 2007
I-5 North Coast Corridor Project – Traffic Demand Forecast Report – Technical Report #5 – August 2007
I-5 North Coast HOV/Managed Lanes Project – Technical Report No. 4 Existing Conditions Traffic Analysis – March 2006
Freeway Interchanges Operations Report – Technical Report #6 – August 2007
The Interstate 5 San Diego North Coast Corridor System Management Plan – Draft – August 2010
I-5 North Coast Special Traffic Studies Final Report – December 2009
I-5 North Coast Managed Lanes Value Pricing Study from La Jolla Village Drive to Vandegrift Boulevard – Concept Plan Volumes 1 & 2 – April 2006
I-5 North Coast Freeway Operations Report Prepared for the I-5 North Coast Corridor Project – June 2010
I-5 North Coast Traffic Report – A Summary of Traffic Reports Prepared for the I-5 North Coast Corridor Project – June 2010
Visual
Design Guidelines – Interstate 5 North Coast Corridor Project – September 2013
Interstate 5 North Coast Corridor Project Visual Impact Assessment – April 2009
Hydrology
Encinitas Creek Location Hydraulic Study – Section 12 Encinitas Creek Supplement – April 2009
Interstate 5 North Coast Floodplain Studies –Book 1 – February 2008
Interstate 5 North Coast Floodplain Studies – Book 2 – February 2008
Interstate 5 North Coast Floodplain Studies – Book 3 – February 2008
Los Penasquitos Creek Location Hydraulic Study – Section 2 – Amendment – March 2009
Interstate 5 North Coast Floodplain Studies – Section 4 – San Dieguito River Amendment – February 2009
Water Quality
Interstate 5 North Corridor Water Quality Report – July 2009
Geology
Preliminary Geotechnical Report (PGR) – Construct State Route 5 Freeway in San Diego County from the 5/805 Interchange to North of State Route 76 – October 2005
Hazardous Waste
Aerially-deposited Lead Survey – Interstate 5 and Genesee Avenue San Diego, California – January 2008
Aerial Deposited Lead Investigation Between Leucadia Boulevard and Brooks Street – June 2001
Limited Phase II Environmental Site Assessment – Del Mar Heights Road to Birmingham Drive – November 2005
Phase II Environmental Site Assessment – Birmingham Drive to Vandegrift Boulevard – October 2006
Site Investigation Report – Lead Investigation from Via De La Valle to Leucadia Boulevard – June 2001
Air Quality
Air Quality Analysis – Interstate 5 North Coast Corridor Project – August 2007
Air Quality Study – I-5 North Coast Corridor Widening Project – Mobile Source Air Toxics (MSAT) Analysis – June 2008
Final Air Quality Analysis – Mobile Source Air Toxics (MSATs) Update – I-5 North Coast Corridor Program – May 2013
Final Air Quality Analysis (Update) I-5 NCC Project – August 2013
Noise
Preliminary Noise Abatement Decision Report (NADR) Volume 1 – Interstate 5 North Coast Corridor Project – June 2007
Preliminary Noise Abatement Decision Report (NADR) Volume 2 – Interstate 5 North Coast Corridor Project – June 2007
Final Noise Study Report for Interstate 5 North Coast Corridor Widening Project – April 2007
Appendices
Appendix A: Noise Measurement Data – April 2007
Appendix B: Measurement Site Photographs – April 2007
Appendix C: Sensitive Receptor & Noise Barrier Locations – April 2007
Appendix D: Computer Noise Modeling Input / Output Files – April 2007
Appendix E: Street Addresses for Noise Sensitive Receivers – April 2007
Appendix F: Cost Analysis Worksheets A & B – April 2007
Biology
I-5 Coastal Lagoons Tidewater Goby (Eucyclogobius newberryi) Comprehensive Suitability and Survey – October 2012
Natural Environment Study – Interstate 5 North Coast Corridor Project – June 2008
Natural Environment Study Report – Manchester Ave/I-5 Interchange Project – City of Encinitas and City of Solana Beach – January 2004
Batiquitos Lagoon Bridge Optimization Study Final Report – April 2012
I-5/SR78 Interchange Preliminary Engineering – I-5 Bridge Study at Buena Vista Lagoon – Fluvial Hydraulics and Residence Time Analysis – Final Report – May 2012
San Elijo Lagoon Bridge Optimization Study – April 2012
San Diego Regional Lagoon Overview Phase 1 Planning Study – I-5 North Coast Corridor Project – December 2009
San Diego Regional Lagoon Planning Studies Phase 2 – Summary of Findings for Wetland Enhancement Opportunities Using the Hydrodynamic Approach for Optimization of Bridge Design at Batiquitos and Agua Hedionda Lagoons – October 2010
Wandering Skipper Survey – Interstate 5 North Coast Corridor Project – September 2012
Appendices
Appendix P: Resource Enhancement and Mitigation Program – July 2013
Sitefinity ASP.NET CMS