Build NCC | Rail Improvements

Build NCC rail improvements included as part of the NCC program are part of a 20-year plan to invest nearly $1 billion in double track improvements from the Orange County line to Downtown San Diego. To date, approximately two-thirds of the San Diego segment of the LOSSAN rail line has been double tracked, which allows trains traveling in opposite directions to pass without slowing or stopping.

Build NCC rail improvements include:

  • San Elijo Lagoon Double Track Project, which will add 1.5 miles of double track from Cardiff-by-the-Sea to the southern border of the San Elijo lagoon and replace the existing wooden trestle bridge with a concrete, double-tracked bridge.
  • Batiquitos Lagoon Double Track Project, which will add approximately .75 miles of new double-track across the Batiquitos Lagoon and replace the existing wooden trestle bridge with a concrete, double-tracked bridge.

Some local lane closures are anticipated. For the latest information on closures, view the closure list.

Questions? Call our construction hotline at (844) NCC-0050 or email us at BuildNCC@KeepSanDiegoMoving.com.

To receive construction alerts via text message, text BuildNCC to 313131. 

Learn more about Build NCC:

Project Features

I5 Visual Sim San Elijo Lagoon Rail Bridge

Replacement of San Elijo Lagoon rail bridge to add a second track and to improve lagoon tidal flow.

Status: Construction begins 2017

DevonshireStreet Batiquitos Lagoon Rail Bridge

Replacement of Batiquitos Lagoon rail bridge to add a second track and to improve lagoon tidal flow.

Status: Construction begins 2017

bikeDevonshireStreet Chesterfield Dr. Rail Crossing Improvements

Improvements to rail crossing at Chesterfield Drive to improve access for people walking and biking.

Status: Construction begins 2017